Concept: The zone linked to each Assessment Regime must be operational within the Reporting Period in the cdrqaqc vocabulary

Concept URI http://dd.eionet.europa.eu/vocabulary/aq/cdrqaqc/C28
Preferred label The zone linked to each Assessment Regime must be operational within the Reporting Period
Definition The lifecycle information of ./aqd:zone xlink:href shall be current,/aqd:AQD_Zone/am:designationPeriod/gml:TimePeriod/gml:endPosition shall be greater than the begin position of the aqd:reportingPeriod included in the ReportingHeader If endPosition is indeterminate (i.e.<gml:endPosition indeterminatePosition="unknown"/>) /aqd:AQD_Zone/am:designationPeriod/gml:TimePeriod/gml:beginPosition shall NOT be greater than the begin position of the aqd:reportingPeriod included in the ReportingHeader
Notation C28
Status Valid
Status Modified 2017-08-04
Accepted Date 2017-08-04
Not Accepted Date
Hidden label
  • The zone linked to each Assessment Regime must be operational within the Reporting Period [en]
Editorial note
  • Crosscheck to ensure Zone operational within Reporting Year
Error type
  • BLOCKER